You are here: Home » Schools & Councils » Playground markings » Road & Railway

Browse

Powered by WorldpayView Our Refund Policy
Road & Railway

Road & Railway

All our Markings come complete with a FULL 5-YEAR WARRANTY which not only covers colour performance, but also the application.

  • Road & Railway

Prices

Supply with installation
Roadway 10m x 8m
£888.41
  • Road & Railway
Roadway per metre
£12.45
  • Road & Railway
Zebra Crossing 0.5m x 0.7m
£66.36
  • Road & Railway
Level Crossing 1.2m x 0.3m (pair)
£100.62
  • Road & Railway
Railway Track per metre
£14.28
  • Road & Railway
Chequered Flag 0.4m x 1m
£88.23
  • Road & Railway
Roundabout 1.5m x 1m
£62.03
  • Road & Railway
Station 1m x 0.6m
£122.32
  • Road & Railway
Buffer 1.5m x 1.2m
£94.48
  • Road & Railway
Traffic Lights 1.2m x 0.3m
£66.99
  • Road & Railway
Pit Stop 3m x 1.2m
£328.14
  • Road & Railway
Work 1.2m x 0.9m
£101.96
  • Road & Railway
Tunnel 1.2m x 1m
£198.20
  • Road & Railway

Notes

CONDITION OF SURFACE

The surface must be free of dirt, dust, chemicals and any significant oily substances.

Our Thermoplastic Playground Markings cannot be supplied on top of old or cold plastic, although they can be applied on top of other thermoplastics, provided these are already well adhered to the surface.

Prior to applying the markings, the school will need to ensure that there are no loose aggregates on the surface where the markings are to be supplied.

Sovereign may need to charge extra for preparation and cleaning of the surface prior to marking if this has not been done.

Sovereign are able to create individual designs, providing basic artwork is supplied, by quotation only.

As our policy is one of continuous improvement, we reserve the right to change specifications without prior notice.

All designs include the detail and lettering shown. Additional details and alterations can be undertaken subject to price verification.

PLEASE NOTE
The minimum order value for Playground Graphics is £600 plus VAT. All prices exclude VAT. Terms and conditions available on request.

Testimonials

quotestartquoteend

June Russell, the Area Manager for Sovereign has been outstanding throughout the whole process - as has the whole team. They have put a huge amount of time and effort into getting it just right. The communication and high level of customer care has been excellent. Even the installation teams couldn’t have been more helpful. When the sails finally went up, the parents that had gathered gave a huge cheer to express their delight.

Mrs Brody, Head Teacher, Our Lady Immaculate RC Primary School.